on 12-12-2018 10:27 AM
Dear Experts
I want to update the inspection characteristics of an inspection lot if the inspection plan has changed.
I need to cancel the Sample with a fm or a bapi. Like in QAC3
thank you and best regards
Edi
Hi,
There are no automatic option possible for this. You will have to create a development upon inspection plan save button.
The below exits are available at QP02.
CMDI001 Determine explosion control for BOM
CPAU0001 Enhancement for Authorization Check in Task Lists
CPDO0001 Test units of measure for reference operation set
XCZD0004 Extend authority check for the material-recipe allocation
CPRE0001 Enhancement for Reorgnization Checks in Task Lists
Thanks
Prem
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Prem
Thanks for your answer.
My plan is to run a daily job and update the inspection lots where the plan has changed.
Without any automatism i would go to qac3 and cancel the sample.
Then in qa02 i would go to Sample and press the Sample Calculation button.
The Sample Calculation works with the FM QEEV_TABLES_GENERATE.
But i don't know a function modul or bapi who cancel the sample like qac3.
Best Regards
Edi