Former Member
Feb 24, 2010 at 06:14 AM

Problem with CK11N

15 Views

Hi,

When running Ck11n in simulation mode, for one parent material the cost for the dependent materials is not getting calculated only for parent material the cost is calculated for the rest of other materials system is calculating the costs for all the dependent materials as well as for parent materials.

I checked the Material master Costing view of this problematic Dependent Materials where it is ticked as Costing with Qty structure.

I checked the BOM of the parent material for cost relevancy and found costing relevancy in BOM items.

Now what are the other areas relevant for pp for CK11N to identity the problem?

pavan