Hi ,
I have maintained the owner allocation as : Owner allocation with automatic move-in (in configurartion).
The below values has been maintained in the config:
Earliest start date : 5 days
latest start date : 10 days
Then i have created an property with the 01/01/2010.
I have assigned an installation and maintained validy period as 02/01 to 05/31.I have checked the create event in the tranacstion.
I have performed the moved out for the X installation on 10/01/2010.
as per the system calculation :
Move-out date
10/01/2010
upper limit
15/01/2010
lower limit
22/01/2010
move-in date
01/02/2010
The move-in should happen automatic on 01.02/2010.But the work flow is not triggering.The automatic move-in is not triggering.
Can any one suggest the solution.
Thanks in advance.
-Santhosh