Problems with event when changing Purchase Requisition. (BO:BUS2009)

Hi experts,

I have a doubt with this. When i erase a position in the Purchase Requisition (ME52N), the event SIGNIFICANTLYCHANGED of BUS2009 is raised.

When I try to modify the Purchase Requisition not erasign the position but changing the Material group the event is not raised. Can i customize the system to define that changing the Material group is a significantly change for my system? If not, can i raise another event when this happens?

Thanks!!

Artur.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • Best Answer
    Posted on Feb 12, 2010 at 09:46 AM
    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Feb 12, 2010 at 06:45 PM

    Hi,

    Simply create a custom event called CHANGED in the BO.

    Create a entry for this event in SWEC tcode. Select the radio button on change.

    This should do the job.

    Note : This event will be raised for any kind of changes in this purchase requisition.

    Regards,

    Raj

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.