Skip to Content
author's profile photo Former Member
Former Member

PR on work order

Hi gurus,

Currently the i have set my work order as Collective PR.

The problem is there are time that the PR was already converted into PO and i input a new non stock item to the work order the system includes it in the old PR number.

What the business want is when the PR is already converted into PO and a new component was included in the work order this should trigger a new PR number.

How can i configure this.

Thank you so much!

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Feb 11, 2010 at 12:14 PM

    I dont think it is possible to the std. You may require to use some exit.

    Try this exit and discuss with your technical guy.

    COZF0002 for components

    COZF0001 for Operation.

    DP

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Feb 13, 2010 at 09:31 AM

    i agree with narasimhan. then you may just have to do away with collective PR.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.