Hi.

I have a Purchase Order already approved but I will receive the invoice from a partner different from the vendor. I forgot to put this information in the PO.

I enter in transaction ME22N (Modify Purchase Order), I select tab "Partner" in the Header and I add function PI (Invoicing Party).

When I save the PO the release strategy starts from the beginning, it is reset by the system. I don't understand why.

Could you please explain the reason? This is the only change I'm doing. Nothing else has been modified.

Thank you very much.

Fabio

Edited by: Fabio Tomaselli on Feb 11, 2010 8:09 AM

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Feb 12, 2010 at 09:14 PM

    Is there anyone who can help me?

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      The following cases can arise when a purchase requisition or external purchasing document for which the release procedure has already started is changed:

      Case 1: Insignificant change that does not necessitate a different release strategy.

      Case 2: Relevant change that does not necessitate a different release strategy.

      Case 3: Relevant change that necessitates a different release strategy

      In each case, the system issues a message to the user after the change has been made.

      Case 1

      Instead of 10 tons of Steel 1 at a total price of $100, only 8 tons are needed, at a total price of $80.

      This subsequent change to the document is possible.

      The release procedure continues uninterrupted.

      Case 2

      A user has the authorization for purchase orders valued between $1,000 and $120,000. Release strategy FS is assigned in this case.

      The user has ordered 10 cameras at a price of $1000 each. The release procedure has already started and the release indicator 01 (free for issue of RFQ) has been set.

      The settings made in Customizing for Purchasing for release indicator 01 are such that the system will issue a warning message if the original PO value is exceeded by more than 50%.

      The user then changes the PO to 100 cameras, causing the PO value to increase by more than 50%. The system reassigns release strategy FS and issues the warning message. The user has the following options:

      Correct the PO, so that the percentage is not exceeded. The release procedure then continues.

      No correction to PO. The system then cancels the previous releases and the release procedure starts all over again from the beginning.

      Case 3

      An electron beam welding machine assigned to project A is to be subsequently reassigned to cost center 3. Again, it is not possible to simply go ahead and make this change. The system will issue an error message. Either the change must be cancelled, or the release strategy redetermined and the approval procedure restarted.

      Your case is same to Case 3 here, so unless you change the WF then it will be triggered for a new release.

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.