Please let me know how the system behaves for the following business process:

SD:

Based on a PO, a Sales Order is raised in SAP. Now, during the creation of Sales Order, what exactly happens....

To my knowledge Availability Check will be done and then Qty will be confirmed based on the Item Cat. and in turn the Schedule Line Cat.

Now, from the MM perspective ...what happens?? .. MRP will be run periodically by the concerned department ???

Consider two scenarios:

Scenario 1: Stock available and

Scenario 2: Stock not available...then will it lead to PP.....

the same case for the Make to Order Scenario.....details ???

In short the entire cycle of SD - MM - PP.....

Regards

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

2 Answers

  • Best Answer
    avatar image
    Former Member
    Feb 05, 2010 at 09:08 AM

    Hi,

    Consider two scenarios:

    Scenario 1: Stock available

    If stock available it confirm date & reserve the stock

    Scenario 2: Stock not available...then will it lead to PP.....

    If stock will not available then it pass the requirement to MRP

    That can be viewed by t-code MD04

    Then Run MRP by t-vode MD02 or MD03 then system will create plan order

    Convert this plan order in to production order

    Confirm Production order by t-code CO15

    Stock posting to storage location

    Kapil

    Edited by: Kapildev Farakte on Feb 5, 2010 2:38 PM

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi,

      Then on the same day if iam creating another sales order (Qty - 100) - then wat will happen ??? with the stock...

      It will not confirm qty and reserve becauz you have 100 qty. and that already reserved previous sales order,

      (Reservation is doeson't mean BLOCK qty) However still you can able to deliver second sales order.

      Kapil

  • avatar image
    Former Member
    Feb 05, 2010 at 09:17 AM

    the intergration points between MM, PP, and SD is the availability check

    In material master availability field, PP is for to configure the requirement type and mrp type and SD will

    work according to the reqt type ie 041 sale order reqt

    Regards,

    MT

    Edited by: M T on Feb 5, 2010 10:19 AM