on 02-04-2010 10:36 AM
Dear friends,
I intend to run MRP using a split valuated material. What are the settings to pick the material that i want t
Hi
MRP will not give desired results for split valutaion. I mean to say If a material XXXX has valuation type A and B. MRP plans at XXXX not XXXXA and XXXXB. Manual intervention is always required when you convert planned order or RP to PO.
Hope my answer helps you
Regards
Antony