Skip to Content
0
Former Member
Feb 03, 2010 at 11:23 AM

In-process inspection

20 Views

Hi, I have assigned 03 insp lot in material master and in routing I assigned 150 as inspection point (with partial lot for each inspection point setting in routing header). The issue is that if the operation qty is 10, the system is allowing me to enter more than 10 (either partial or final qty) while results recording (first time 5 qty and next time 6 qty) in qa32, thru results recording tab. I want some control that system should not allow more than the operation qty to do results recording. Please advise how to attain the same. In case if we have 10 operations, do we need to do UD (QA11) after completion of results recording of all operations or can we do the UD for individual operations. Please advise.