on 02-02-2010 7:09 PM
If I need to put a check in PCR for how to read T511K table based on check date or period start date how could I do that? Answer this will solve my problem
Saurabh Garg
resolved
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Saurabh Garg,
I also want to know how to enter Constant value in T511k. Currently in my company EOBI Employer Contribution Is hard core in PCR.Ex: If employee contribution is -70 Rs and in pcr multiply wiht -6 its value show 420.How can i enter in table t511k with time period.
Also Payroll posted results.
Thanks in advance.
Regards
Jazib Tariq
Hi,
If you are using the same constant for multiple period, just adjust your start date and end date of the Constant by delimiting the value.
With Regards
Shyam V
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I don't know if I'm getting you right, but usually, you read a Constant from a PCR using the K parameter in the next assignment: AMT=KZCONS. By assigning the value 1 or 0 for differents periods within V_T511K, you can check if you have to continue processing or not.
Regards.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
91 | |
10 | |
10 | |
6 | |
5 | |
5 | |
5 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.