cancel
Showing results for 
Search instead for 
Did you mean: 

Dynamic Modification rule

Former Member
0 Kudos

Hi

My scenario is that same raw material is purchased from 2 different vendors. One vendor is a self certified vendor and another is not a self certified vendor. For Self certified vendor I want to record results for once in 2 months. If results rejected self certification is invalid and results to be recorded for the next five lots.

For the another vendor I want to record results for each and every lot.

Kindly provide solution for this.

Thanks & Regards

V. Devaraj

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi

Use following DMR

stage 10::

inspection severity : blank

skip : Blank

ist: tick

short text: Inspect

New insp. stage 20

Rejections 1

New insp. stage 30

stage20 :

inspection severity :

skip : Tick

ist: blank

short text: Skip

Number of Skips-30

Max. skip duration:60 days

New insp. stage 10

Rejections 1

New insp. stage 30

stage30 :

inspection severity : blank

skip : Blank

ist: tick

short text: Inspect

No of inspect:5

New insp. stage 20

Rejections 1

New insp. stage 30

Add this DMR to a group counter & use Vendor name in the Task list header(material assignment)

For vendor you want to inspect do not add DMR

Regards

Sujit

Former Member
0 Kudos

Hi Sujit,

Thanks for your reply.

Regards

V. Devaraj

Former Member
0 Kudos

Hi Sujit,

In your reply In stage 30 I need the following clarifications:

stage30 :

inspection severity : blank

skip : Blank

ist: tick

short text: Inspect

No of inspect:5

New insp. stage 20

Rejections 1

New insp. stage 30

No of Inspection : 5

If the result is OK then skip not allowed here and results should be recorded for all lots during next 2 months as previous results are not OK.

I request your help in this query.

Thanks & Regards

V. Devaraj

Former Member
0 Kudos

HI,

Create the inspection plan for the material with two group counter and assign different DMR in the header for each task list

and in the material assignment , assign the vendor for each DMR specified group counter header.

so the DMR will be effective for the particular vendor which u asiign in the material assignment.