hi,
PP gurus,
i have two material documentfor production declaration through MFBF for same material also at same date
say ike 50000 & 30000 qty in mb51
but in infostructure (S025) there is only one entry i.e. 50000
i am checking my all document but cant found it
also in afru table both entries are match with Mb51
can anybody tells how it is happen
thanks in advance
regards,
umesh