Lot size in material master

Please advise my below understanding is correct. If we select EX in lot size field in mrp views, mrp will generate the pr of qty equivalent of sales order qty. if we select FX, it will generate the pr of qty equal to fixed lot qty mentioned in mrp views. While calculating the above qty it will deduct the existing stock of that material and for remaining qty, it will generate pr (purchase requisition).

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • Best Answer
    avatar image
    Former Member
    Jan 27, 2010 at 08:03 PM

    YS,

    I think you have the sequence of events reversed. MRP will perform net requirements calculation (including consider all existing requirements and supply elements, such as stock) and come up with the shortage quantity(s). Once the shortage is known, THEN it looks at the lot sizing procedure and calculates a replenishment order.

    When FX generates an order, it will always be for the fixed lot size, even if the shortage is only one widget and the fixed lot size is 1000 widgets.

    http://help.sap.com/erp2005_ehp_04/helpdata/EN/5c/33b8371a2c9912e10000009b38f889/frameset.htm

    Rgds,

    DB49

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      YS,

      If sales order is 100, and the shortage is 1, then that implies that you have 99 in stock available for this order. In this case, if the lot size is EX, then the proposal will be for 1.

      You really would be better off experimenting in a sandbox system. 20 minutes of work in the sandbox could answer dozens of these questions, and the resulting answers are instantaneous.

      Rgds,

      DB49