on 01-27-2010 3:27 AM
Hello,
SAP 4.6c.
/virsa/ZVFATBAK is running currently in the system at specific periods.
Should this job be running on each application server of the system?
Or just a one time schedule in SM36 for the entire system is good.
Kindly advise.
Thanks.
Prasanna
Prasanna,
If you have super users logging into your application servers, then yes, you will have to schedule the job there. If you don't, then you are good.
Make sense?
Thanks!
Ankur
SAP GRC RIG
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
All,
The job was previously running every 1 hr.
Problems started when the frequency was changed to 4 hours and the log report was not getting generated.
Performed the following:
Rescheduled the job every 1 hr on every app.server.
Thanks for the support.
Prasanna