Dear Expert,
I have activated 13 insp type for my semi-finish material,
in the routing also for the last operation control key has maintained.
Finally in the production version also we have selected the the same routing.
I am not able to create Inspection lot for repetitive manufacturing.
Please tell me what settings need to be done.
Thanks
DON