Budget with modification time (TIMESTMP)

Hi,

Does someone knowif there is a table which stores WBS budget with modification time ( not with modification date)? ( Like COSP and COSS for planned and actual cost)

Thanks a lot,

Sara

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

4 Answers

  • Posted on Jan 21, 2010 at 08:58 AM

    not sure if the time is actually stored . . . .

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 21, 2010 at 09:24 AM

    If I only can see budget by modification date, would be BPVG the best table to obtain this or is there a best option?

    Thanks,

    Sara

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 21, 2010 at 09:50 AM

    What are BPYD and KAEP-BDG exactly?

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jan 26, 2010 at 12:57 PM

    Please check the standard report CJI8 where you will get the date

    Regards,

    Shareeq

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.