I have a query regarding Batches.

1. When producing a Semi-Finish Good (let A) from Raw Material (let a) -


they give a batch (let 123)

Now when they make a Finished Good (A) from SFG (A) -


they need the same batch (123) automatically there which is editable too.

2. They want that every next item produced in the Stage "RM to SFG" , should get the batch incremented by 1 of the previous batch alloted. Like a sequence.

Is there any solution for the above?

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Jan 20, 2010 at 07:04 AM

    Neetu,

    The only way would be to create a formatted search to reference the SFG item and generate the FG batch and so on for the other 2 cases.

    Suda

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Oct 09, 2010 at 10:20 AM

    Hi Neetu,

    I am looking for a solution in Textiles, (Fabric job work, supply chain management and material management)

    Please contact me if you have done any similar project.

    Regards,

    Vaibhav Jalan

    Sri Shyam Fashion Textiles Pvt Ltd.

    +91 9830009100

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.