I have a problem regarding the allocation of one cost element into other cost elements within the same cost center. Any body have a clue how to do that or can we do that at all ?

For Example:

Within cost center X:

(Before):

Cost Element A = 1000

(After):

Cost Element B = 600 + Cost Element C = 400

i.e. The amount of Cost Element A has been allocated to Cost Elements B & C using some tracing factor.

I have already triied assessments and distributions but they only allow allocations using a single reciever cost element. There is no option of using cost elements in the reciever category in transactions KSU1 and KSV1.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Best Answer
    Posted on Jan 18, 2010 at 11:50 AM

    Hi,

    It's not possible; allocation in CO module is always between cost objects (cost centre, I/O, etc.) and not between cost carriers (cost elements).

    Regards,

    Eli

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.