on 01-12-2010 4:21 AM
Dear all,
I need to pack the Finished item with 7 Packaging Components ...it;s like Header material and components.
X-Header material ,Under X having 6 components.
I did this in POP1 T-code....
2) in POF1 i assigned this to my material.
Req: in Delivery when i click on automatic packing ,it's happening but,for every Components Handling unit number is generating.
But , i need to generate Handling unit for only Header material,How can i control this.
Thanks in advance
Regards
Raj.
Hi Raj,
IMHO this requirement is a little confusing.
Are we talking Multi-packing here?
In SAP finished products are usually packed directly on pallets.
Another possibility is to pack the products in boxes and then the boxes are packed on pallets.
If this is what you want, then you need 2 separate packaging instructions, because technically speaking the packing takes place in 2 steps and then you see the results after automatic packing.
Does it solve your question?
Best Regards,
Franck Lumpe
Freelance SAP Logistics Consultant
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Franck,
Lets take Laptop.
to pack Laptop required single card box...inside the card box ..using 3 small card boxes (Sides,Bottom,top).
I configured this in SAP as automatic....system is generating total 4 handling unit numbers.
but i need to generate only one handling unit.for main card box.
If customer orders 10 qty.10 handling units.(Now system is generating 40 handling units.
Thanks in advance
Regards
raj
User | Count |
---|---|
85 | |
7 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.