requirements.jpgGood afternoon.
I have some materials (almost 100) which they are sold from storage location 0035 as finished products, but, at the same time, they can used in storage location 0057 as semi-finished materials in the production of another SAP code (OrdRes requirement in the attached image).
Right now, a production order for this material combines these two requirements in creating one production order (in storage location 0045) for the two requirements quantity. How can I configure the system in order to create different production order for the OrdRes requirements? Is it anyway possible?
Best personal regards
Nikos
Hello Nikos,
Pl try with the indicator - Individual/Collective requirements in MRP4 view of material master.
Pl maintain it as Individual requirements.
Thanks,
Dheeraj
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
110 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.