Skip to Content
0
Nov 14, 2018 at 06:47 PM

Cancelling a non stock relevant inspection lot

453 Views

Hello Experts,

We created a K (cost center) PO and the material has QM active. After GR, an inspection lot was created. We cancelled the material document, but it didn't cancel the lot. It is still in REL, CAL status.

I tried canceling the lot through Function --> cancel lot, but its grayed out.

Also, we have a control ins.lot as 1 for material document and system clubbed and created one inspection lot.

Can someone please advise how should we cancel the lot.

Thanks,

Parth