Changes in bom are getting updated after MRP

27 Views

Hi All

Iam using material Bom for header material

Below header at level 1 there is material A which is made phantom in BOM of header material

At level 2 below A material X is available.

Iam changing component X with ROH material type with other component Y with ROH material type.

After that MRP run is done.

PR created for X is not firmed but system is not deleting it and in CO46 iam getting MAterial X instead of material Y.

When i remove phantom status of material A in BOM of header material then after MRP run system is removing material X and put material Y ( Once changes are made in BOM of A)

Planning file entry for material A contains explode bom tick in both cases.

Please guide .