on 12-23-2009 3:07 PM
Hi All
Iam using material Bom for header material
Below header at level 1 there is material A which is made phantom in BOM of header material
At level 2 below A material X is available.
Iam changing component X with ROH material type with other component Y with ROH material type.
After that MRP run is done.
PR created for X is not firmed but system is not deleting it and in CO46 iam getting MAterial X instead of material Y.
When i remove phantom status of material A in BOM of header material then after MRP run system is removing material X and put material Y ( Once changes are made in BOM of A)
Planning file entry for material A contains explode bom tick in both cases.
Please guide .
Hi,
When you say changing X with Y, do you mean replacing the component in the BOM itself or do you mean follow up functionality?
I presume you're replacing X with Y, if yes can you check if you're replacing the part with the same valid-from dates? Also when you run MRP, keep the planing mode as 2.
With the above run MRP by keeping A phantomized & check if the component is switched from X to Y.
Regards,
Vivek
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Vivek
I am replacing X with Y. VAlid from dates are from 23-12-09 and bom explosion date in planned order is 23 June 2010.
When i remove phantom for A then i get proper result.
I have done MRP with mode 2 but result is same.
I have created new sales order but there are also i find same result.
Please can you check in your system and confirm.
Edited by: mayuresh bhurke on Dec 24, 2009 10:57 PM
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.