PDS input component not transfered

70 Views

Hi Experts, I'm transferring production versions from ECC 5.0 to SCM 5.0 and I'm having problems with the PDS components. All the input components of the PDSs that I have transferred/changed are missing.

All the BOMs I'm working with have components defined, these are allocated to operations in the different routings and the production versions don't have inconsistencies.

The integration model has:

PDS checked

Material: the list of materials for which I want to transfer production versions

Plnt: the plant I'm working with

MRP Type: X0

Any idea of what could cause the components not to transfer?