on 12-22-2009 3:33 PM
Hi Experts, I'm transferring production versions from ECC 5.0 to SCM 5.0 and I'm having problems with the PDS components. All the input components of the PDSs that I have transferred/changed are missing.
All the BOMs I'm working with have components defined, these are allocated to operations in the different routings and the production versions don't have inconsistencies.
The integration model has:
PDS checked
Material: the list of materials for which I want to transfer production versions
Plnt: the plant I'm working with
MRP Type: X0
Any idea of what could cause the components not to transfer?
Many thanks,
Diego
Hi,
Please check following things-:
1. All the products header as well as components are already transfered in APO.
2. Go to CFM5 enter header and component materials and check that header as well as component materials are already in active integration model.
3. Also check Scheduling relevent workcenter/resource are in active integration model.
4. Please use seperate integration models for different master data objects like material, workcenter, production version etc.
5. Genrally I faced this problem because components are not in active integration model.
Hope this helps.
Regards,
Siddharth
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
9 | |
4 | |
3 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.