PDS input component not transfered

Former Member
0 Kudos

Hi Experts, I'm transferring production versions from ECC 5.0 to SCM 5.0 and I'm having problems with the PDS components. All the input components of the PDSs that I have transferred/changed are missing.

All the BOMs I'm working with have components defined, these are allocated to operations in the different routings and the production versions don't have inconsistencies.

The integration model has:

PDS checked

Material: the list of materials for which I want to transfer production versions

Plnt: the plant I'm working with

MRP Type: X0

Any idea of what could cause the components not to transfer?

Many thanks,

Diego

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

Please check following things-:

1. All the products header as well as components are already transfered in APO.

2. Go to CFM5 enter header and component materials and check that header as well as component materials are already in active integration model.

3. Also check Scheduling relevent workcenter/resource are in active integration model.

4. Please use seperate integration models for different master data objects like material, workcenter, production version etc.

5. Genrally I faced this problem because components are not in active integration model.

Hope this helps.

Regards,

Siddharth

Former Member
0 Kudos

That was it! The missing components were not part in any active integration model.

Thank you very much.

Diego