Hi experts,

I was converting a planned order to production order in the MD04 screen and the system displayed the following error:

No task list for select.ID 01 for auto. task list selection found

Message no. CP010

Diagnosis

During routing selection, the system searches for the selection criteria entered in Customizing for the selection ID. However, no corresponding routing was found.

Although there is a routing system does not pick up the available one.Is there any routing selection criteria to be maintained in the customising so that this error does not rise.

regards,

Shanmugam

Add a comment
10|10000 characters needed characters exceeded

Related questions

7 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Dec 22, 2009 at 06:51 AM

    Hi,

    Thanks for the replies.

    In OPPQ, BOM,Routing select ID =01

    In OPEB, ID=01, Task list type=N

    In OPL8, Routing selection =6 (mandatory selection, automatic) and Task list type =N. Please tell me if routing selection =6, this error may occur.

    regards,

    Shanmugam

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 21, 2009 at 08:18 AM

    HI

    Check in OPPQ plant parameters for the BOM?Routing selction id and also in OPL8 for the order type dependent parameters for your order type under the routing tab and selection id

    Also Check whether the routing for the material is maintained and also check the valid from date of routing

    Check and revert

    Regards

    Anupam Sharma

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 21, 2009 at 08:20 AM

    Dear,

    Go to transaction code OPEB and check the setting for

    selection ID Priority Task list type Plan usage DESrp Status

    01 1 N 1 Prod 4

    Check and revert back.

    Regards

    Atul

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 21, 2009 at 08:24 AM

    Dear Shanmugam,

    1) Go to OPL8, for ur plant & order type combination

    2) check for option Routing selection make it as 3 & tak list type as N

    3) check the dates of Routing

    4) Run MRP with parameter 3 - delete & re-create planning data

    5) then convert plan order to production order

    Regards

    Madhu

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 21, 2009 at 09:21 AM

    Dear Shamugham,

    In my understanding I guess ther was no routing copied to the planned order itself during MRP run(Lead Time Scheduling),so

    kindly check what routing selection ID is assigned in OPPQ for the particular plant.

    So for this selection ID,check in OPEB for that selection ID to which task list type the first priority is set,If it is set for N - then it

    means the system searches for a normal routing and likewise it goes for the next priority.

    So after checking this setting re-run MRP,and ensure the system does not shows any exception message for 61 or 62.

    Regards

    Mangalraj.S

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 22, 2009 at 08:26 AM

    Hi,

    Issue resolved,thanks to all the contributors.

    regards,

    Shanmugam

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Feb 06, 2012 at 01:33 PM

    Hi Everybody,

    i need to introduce a custom (user exit or other) to drive the routing selection among alternative routing at the moment of planned order conversion into production order. I need to have this functionality both for individual that massive conversion.

    Could you suggest me if there is an exit or a badi to do this. The customizing parameters are not enough for my requirements.

    Thanks a lot

    Ugo

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.