cancel
Showing results for 
Search instead for 
Did you mean: 

Data Package 5 : arrived in BW ; Processing : Selected number does not agree with transferred

Former Member
0 Kudos

Hello All,


I am facing issue in data load from ECC to BW. Info package load is stuck in yellow. In detail tab I can see message as in attachment.


I have gone through forum but could not find solution.


The job in ECC is finished successfully. I have taken the IDOC numbers from job log and checked in BD87. the status is 3. I have taken TID and checked in SM58, I could not find any, i.e they are processed successfully. I have checked RFC connection in SM59, and connection check is successful.
The load type is Full, loading to PSA.

Thanks in advance,

Preethi

Accepted Solutions (1)

Accepted Solutions (1)

maggie_yi
Advisor
Advisor
0 Kudos

Hi Sir,

Please check step-by-step following note:

1964223 - No Idocs Arrived from the Source System

If it cannot solve the issue, you may open an incident to SAP and open both BW and ECC systems. We need check further in your systems directly.

Best regards,
Maggie

Answers (1)

Answers (1)

Former Member
0 Kudos

Hello,

The issue is resolved.

Thanks,

Preethi