Single level planning

Former Member
0 Kudos

What setting to be done for single level planning of following BOM.

M1

M1.1

M1.3

M1.2

M1.5

When MRP is run for M1...it shud create planed order for M1 only.....and when MRP is run for M1.1 then it shud create planed order for M1 .1 only...similarly for M1.2.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

There is no special settings required to fulfill your requirement.

You need to run MRP using MD03 transaction. It will take care of your requirement.

Regards,

V. Suresh

Former Member
0 Kudos

Our scenarion is ETO. We are using MD51.

joseph_mazza
Member
0 Kudos

As per the previous post, try using MD03 for each material the the hierarchy consecutively.

MD51 will plan multiple levels.

Former Member
0 Kudos

There wud be manuy mat....MD03 is not practically feasible. Can u suggest other solution

sundaresan_velayudam
Active Contributor
0 Kudos

In MRP 4- In the MRP dependend requirement you can select option 1 material for dependend requirement not planned in header material and then u can run MRP

Regards,

sundaresan

Edited by: Sundaresan . E. V on Dec 26, 2009 9:37 AM

Former Member
0 Kudos

it did not work.

Answers (2)

Answers (2)

Former Member
0 Kudos

done

Former Member
0 Kudos

JJ,

Lets see, you are using ETO, which by design is a multilevel planning process, using project/WBS as MRP segments, but you want to only plan the first level, and then the second level, at your discretion?

Standard SAP does not support this requirement. To me, it seems to defeat the whole concept of project planning. However, I will assume that you have a valid business requirement.

I suggest you speak to your developers to create a specialized selection userexit for MD01. You could craft it to select only M1 material. You could also craft it to select only M1.* materials on a subsequent run. Specifications of the selection process would have to be created by you.

Standard userexit for MD01 can be found in IMG>Production>MRP>Planning>User Exit Material Selection for planning run.

Rgds,

DB49