Hi,
i am trying to run the PPDS optimizer for 6 resources and most of them are alternatives to each other. But strangely all the order are scheduled at the end of the optimization horizon. I made sure that pegging & capacity profile is correct. Weightage for makespan,setup, delay and mode costs are maintained.
As the optimizer is trying to schedule them very late the deallocation costs are very high. I have tried all the settings for the late operations i.e. deallocate and schedule but still same result.
Does someone experianced similar issue?
Regards,
Chaithanya.
Hello,
Did you check the optimizer log?
Each optimization run generates a log file without these details it is difficult to analysis such issue.
You may check SAP note 2019671 - PP/DS optimizer: Scheduling at the end of the horizon
Best Regards,
R.Brahmankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
9 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.