on 12-15-2009 7:25 AM
Dear.
I want to make a cost estimation (CK11N,CK40N) with fixed scrap quantity (BOM) : length(not component scrap, operation scrap).
But system ignore the scrap when cost is estimated.
my system using IS-cable solution.
pls. let me know.
Thanks
Hi,
Check whether you maintain cost component structure for those raw material with cost element assignment.
Regards,
Sreekanth