Skip to Content

DC Build Failure (Reason could be Broken DC's)

I want to modify standard ESS Applications for that reaosn i have installed NWDI and configured it.

After Configuration when i check the CBS, I see there are broken DC's - How to solve these broken DC's to Ok.

Also when i create a project it is throwing errors and the Build is failed.

What i thought is Creation of New Track, but when i want to add Software Components is SAP_ESS is sufficient or anything else required.

Could anyone suggest me what needs to be done.

Add a comment
10|10000 characters needed characters exceeded

Related questions

5 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Dec 09, 2009 at 03:27 PM

    Hi,

    Check the SLD under Software Components, search for your SAP_ESS component. In the details view (when selected) under the tab Dependecies, you'll see the required Software Components (select in Context dropdown "BuildTime").

    Add these Sotwware components as dependecies under SAP_ESS in the Landscape Configurator of the CMS (Track Data).

    After this in the Transport Studio, check them in and import them in Development.

    Hope this helps.

    Regards,

    Alain

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 10, 2009 at 03:30 PM

    Hi

    Have you also import all the depended component of the ESS and PCUI_GP. Please ensure that you have also import all the depended component of PCUI_GP even if this component is not going to be modified.

    Can you give list of components import.

    Thanks

    Arun

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Sankar Narayana Kalapatapu

      Hi Sankar,

      The below error is due to the fact somebody has already logged into SDM.

      You may have to terminate that login or if you dont know who has logged in , you can terminate the SDM process at the OS level.

      As far as Broken DCs are concerned, please check the CBS logs as to what is the reason the broken DC. Correct it manually and redeploy the application.

      Cheeers.....,

      Raghu

  • Posted on Dec 10, 2009 at 07:54 PM

    Deployment of EAR File not deploying.

    Could anyone let me know what could be the problem

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Oct 11, 2010 at 05:53 AM

    Resolved myself

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Oct 11, 2010 at 10:45 AM

    Hi,

    I can see this thread just now, but I am glad that the problem is resolved in the meantime.

    Still, the following guide can be useful for future search:

    Understanding Broken DCs and Dirty DCs

    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/30b7c94e-fc6b-2910-30b8-d34a7b51309e

    Best Regards,

    Ervin

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.