I am looking for some solution for MRP run

In MRP system does not consider the Stock of Alternate material having usage 0% usage probability while generating Proc Proposal

e.g.

Material alt group Usage prob Current stock

500001 A1 100 % 10

500008 A1 0 % 9

Both material ( 500001, 500008 ) are being used in semi-finish material 301234 ( no stock ). There is Dep req of semifinish material is 19 qty

After MRP system create pr of 9 qty for material 500001 , it does not consider stock of alternate material stock of material 500008

Kindly guide me how system will consider stock of alternate material before generating Proc Proposal