Deer Gurus,
I am looking for some solution for MRP run
In MRP system does not consider the Stock of Alternate material having usage 0% usage probability while generating Proc Proposal
e.g.
Material alt group Usage prob Current stock
500001 A1 100 % 10
500008 A1 0 % 9
Both material ( 500001, 500008 ) are being used in semi-finish material 301234 ( no stock ). There is Dep req of semifinish material is 19 qty
After MRP system create pr of 9 qty for material 500001 , it does not consider stock of alternate material stock of material 500008
Kindly guide me how system will consider stock of alternate material before generating Proc Proposal
Ishwar J