Skip to Content
avatar image
Former Member

Quality level

Hi,

We are migrating QM related master data from 4.6C to ECC6. We have loaded inspection plan. Please let me know the importatnt fields that we have to check in inspection plan.

When we try to load quality level, it gives an error stating inspection plan for inspection lot does not exist. At material master level, inspection type has dyn modification rule.

The quality level created when GR is done. Please tell me quality level belong to master data . If so how we can load the quality level.

Thanks

Rajkumar

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • avatar image
    Former Member
    Dec 09, 2009 at 03:39 AM

    Hi

    We are migrating QM related master data from 4.6C to ECC6. We have loaded inspection plan. Please let me know the importatnt fields that we have to check in inspection plan.

    AT HEADER LEVEL

    Usage

    status

    DMR

    Inspection point

    sampling drawing procedure

    AT OPERATION LEVEL

    Work center

    control key

    AT CHAR LEVEL

    Preset indicator

    MIC

    Inspec Method

    DMR

    sampling procedure

    PRT

    When we try to load quality level, it gives an error stating inspection plan for inspection lot does not exist. At material master level, inspection type has dyn modification rule.

    For removing this error you have to apply DMR at Inspection plan header(at lot level) & not at the Inspection type.

    Also make sure that you are maintaining the "material Assignment" with Vendor-material combination if require.

    The quality level created when GR is done. Please tell me quality level belong to master data . If so how we can load the quality level.

    When atleast on lot is created with the DMR attached to the task list you can go & change Quality level in QDL2.

    So actually Quality level which depends upon the Inspection plan's DMR attached.

    Regards

    Sujit

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi

      Yor assumption is correct other that following:

      Either you should mainatin DMR in task list header or at the characteristic level.

      If skip status is updated in QDL2, then what will happen to usage decision, lot created and other sctivities table entry in old system. or once updated, system will automatically create the necessary entries.

      Depending upon the DMR like UD base or Lot based Quality Level will change.You have to take UD for the lot created.

      As Quality level will be created in New system old system & new system will not have any correlation as such.

      Regards

      Suji