Folks,
I'm carrying out in=process inspection on a material (Insp type 03) & expectation is that when I have not done a UD on the Insp lot, the system would stop me from doing the confirmation/GR. On OPK4, I've maintained the reqd settings to "error" out the attempt for GR without results rec or UD on the Insp Lot, yet, the system is allowing me to carry out confirmations/GR.
What could I be doing wrong ??
thnx
Edited by: Andy Yeri on Dec 7, 2009 11:50 PM