Hi Guys,
Please, tell me if it is possible to force the APO system to automatically select FGs with the same compoment and plan them on the same availability date.
F.e. We have 2 products based on same concentrate and I want both of them to be planned at the end of the weekly bucket.
Afterwards I can simply plan concentrates deliveries (arrival to be executed, let's say, a week earlier).
Edited by: Alper Myumyun on Dec 9, 2009 10:48 AM