Skip to Content
0
Former Member
Dec 07, 2009 at 11:58 AM

No standard cost estimate found for the material

922 Views

Hi,

When we are trying to generate the bill systems throws the error as "no statandard cost estimate found" whereas the material is a kmat material.

Actually as per the requirement we should not Run standard cost estimate for any material,we will update the standard price in MR21

What are the settings that i need to do to avoid the above error message while doing billing?

Following error msg is appearing:-

No standard cost estimate could be found for material "300000"

Message no. K/834

Diagnosis

In Profitability Analysis, an attempt was made while valuating with material costing to read for material "123456" a standard cost estimate released on posting date "02.10.2008".

The system has discovered that there are no error-free standard cost estimates released in plant "BP01" on the specific date "02.10.2008" for material "123456".

The material cost estimate is accessed according to the CO-PA Customizing settings for costing key "YG1" under Define Access to Material Costing.

Display Cost Estimate for Material

Display Material Cost Estimate without Quantity Structure

System Response

It is not possible to process the document further.

Procedure

Check your system settings.

Thanks

Kishore