Dear QM Guru's,
I have requirement of automatic inspection lot creation based on production work center.
For example :- I have Inspection Plan A, Plan B and Plan C for Material XYZ. My requirement is that, when inspection lot created for material XYZ ,when we release production order (Early lot creation) , it should create inspection lot based on production work centers in the order. In this case, if production workcenter A is in the prodiction order, system automatically assigned inspection plan A, when workcenter B,it should choose inspection plan B and same for C workcenter.
Can we have this set up in the system?
Let me know if u need any other details.
Thanks in advance.