dear all,
i have an issue please guide me
the senario is
At my client , there is a delivery happening in vl01n i will pick the required quanity and send the lot to the QM for final doc audit then after the QC is passed it will released from the QM then i will do the Post Goods Issue .
the problem is here in the client i have created a delivery document and i have picked the quantity and issued for the final doc audit report , during that time the goods which have been picked will be in the Scheduled for delivery .
Now if the quality check fails for( final doc auidit ( ie for pallletization ) or some nails and packing is not done properaly ) it has to go for rework for the final doc auidit .
If the quantity is rejected and gone for rework. i will have to delete the delivery document and create a fresh delivery doccument .
because only if i delete the delivery document what ever the quanity is there in the Scheduled for delivery will be moved backed to the Bonded store .
and then only it is possible for the goods to be picked and send for QC and after QC pass PGI will be done
My problem is is there any connection can be done from the deleted delivery document and the fresh delivery document
so that
i can able to track the inspection lot generated in the both the deliveries i.e ( the deleted one and the fresh delivery document for which the PGI is done )
Based on this i can create a zreport for the QCheck , becasue the client wants to have a link between the inspection lots generated between the two delivery documents and based on that they wanted to track the inspection lot