Hi Gurus,
We are using 04 inspection- early lot inspection.
Production order quantity is 100Ton. Confirmation done for 75Ton. UD given for the lot with 75Ton. But at the time of confirming remaining 25 Ton, a new lot has been generated. There is no requirement of new lot. How to avoid the second lot?
Thanks in Advance