Skip to Content
0
Former Member
Dec 03, 2009 at 09:00 PM

DATUM TO DATLO

65 Views

Hi all,

We are using SAP in Mexico, so the date is a problem because the server is in Germany, so we have 2 dates. our problem is the inspection lot has Garmany date-time but Material document has Mex date-time, is a way to change datum to datlo???.

The inspecion lot is created automatic because material's master data has it in the quality managment area (Inspection for GR from production).

Example,

Tx CO11N.

the people notify 100 pieces, so the inspection lot is created but with germany date and material document with Mex date.

we prefer Mex date in both.

thanks,