Skip to Content
0
Former Member
Dec 03, 2009 at 10:56 AM

Stock Transport

39 Views

Because when i want transfer stock from unrestricted stock to project stock between two stock in the same company code I must insert in material master in the field SBDKZ the value 2(collective requirement). I can transfer stock without valorize the field SBDKZ with value 2 (collective).

thank you