Hi,
I have created a new material test01 with inhouse production and material availabilty check rule as PP and maintained valid checking group in material master.
i added a stock of qty 1 using MB1C( Mvt type 501). i dnt have any plan orders created yet( i havent run mrp yet). so no planned receipts are there for this material.
I added this material to compoenets of 2 existing production orders with qty 1 each.
Now When i do the availability check on these production orders individually, it shows qty commited 1( based on stock) for both the production orders.
I was thinking once certain stock is commited in prod order1 , it should appear as missing parts in production order2.
let me know if my assumption is wrong or system is not behaving as expected.