Skip to Content
0
Former Member
Dec 03, 2009 at 06:46 AM

Material code conversion once goods are damaged

65 Views

Hi Experts,

In a scenario where I issue goods against a subcon order or to a production order the issued material gets damaged. When I want to take this material back in to the sloc I want the code to be changed to scrap mtl code and then I inward the material. At the same time the stock at subcon's location also should get reduced. (I mean the original material that was issued

Is this possible? Please help

Thanks,

Rajoo