Hi Experts,
In a scenario where I issue goods against a subcon order or to a production order the issued material gets damaged. When I want to take this material back in to the sloc I want the code to be changed to scrap mtl code and then I inward the material. At the same time the stock at subcon's location also should get reduced. (I mean the original material that was issued
Is this possible? Please help
Thanks,
Rajoo