Hi,
I would like to ask for some clarification in using DMR.
For example is I have multiple line item for a GR with separate Inspection Lot Number. How will it be handled during DMR?
A scenario is for a example, I have 10 lot. First 9 lot skipped then 10th lot inspected, then if fail do normal inspection for the next 5 lot.
How will the system behave if GR is done at the same time for the 10 line item.
Thank you,
Raymond