cancel
Showing results for 
Search instead for 
Did you mean: 

Goods issue to production order

Former Member
0 Kudos

Gurus,

I want to issue Goods to production order manually.I need the system to pick the batches for the material automatically,even if it has 100 materials in the production order.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

hi,

Your Question is quite confusing but as per my understanding

You want to issue good to prod orde rmanually ...you could do it MB31wrt Prod order,for this in prod order CO02 goto material compoennet overview and select your compoenet and do batch split the batch will be assigned

when u r issuing this batch number gets trigered

Hope its clear

Regards,

Sravanthi

Former Member
0 Kudos

HI,

MB31 is GR for PO.What i want is i want to issue goods to PO in MIGO manually.I dont want to allocate batch in PO

Former Member
0 Kudos

hi,

Yes ,u could in Migo select goods issue and order and give u r order number automatically 261 will come and issue the goods while issuing u cld allocate a batch number

Hope its lcear

Reagrds,

Sravanthi

Former Member
0 Kudos

hi,

How will the system pick the batches automatically if it is having 100 items in BOM

Former Member
0 Kudos

hi,

How will the system pick the batches automatically if it is having 100 items in BOM

Former Member
0 Kudos

hi,

There are two options automatically or manulaly

I

1)Automatic is the frst post i have given,Were the batch number picks by the system(this is as per the Batch search Strategy u have given)

2)Manually when u issue the goods select the batch number from the drop down and assign a batch number to the component

Hope its Clear

Former Member
0 Kudos

HI,

I apprciate ur inputs,but what i need is

1.I want to allocate the batch only in MIGO not in CO01

2.I know it will allocate batches based on batch search strartegy,but what are the steps for confguration to achieve the goal?

Former Member
0 Kudos

>

> hi,

> Your Question is quite confusing but as per my understanding

> You want to issue good to prod orde rmanually ...you could do it MB31wrt Prod order,for this in prod order CO02 goto material compoennet overview and select your compoenet and do batch split the batch will be assigned

> when u r issuing this batch number gets trigered

> Hope its clear

> Regards,

> Sravanthi

Hi..U are the first to tell goods issue can be done in MB31..

Please check before u post anything into this forum... YOu need not be sure in givig right answers, but you should atleast confirm yours is not wrong...

You want to issue good to prod orde rmanually ...you could do it MB31wrt Prod order

Answers (3)

Answers (3)

Former Member
0 Kudos

no answers

Former Member
0 Kudos

Hi,

Issue to Production Order can Be done by using following T codes,

MB1A use 261 Movemnt type,

MIGO Issue Order

Using CO11N go to Goods Movement.

CO15.

The main problem during issueing is system doesnt pick the batch, u have to put it mauanlly from Drop down,

I think this can be solved by the following way.

Enter the material quantity, Plant and Storage location, Now in Batch tab put a star ( Astrik) ' * ', and post it,

The system propose u the number of batches of that material select the batch and Post it.

The batch will be Picked automaticalled by the system.

PLs check it, come back with result ,

Regards,

Pavan

Former Member
0 Kudos

Hi,

You can use CO27 (Pick list for goods issue).In the same you can issue input materials and do a batch determination.Also changing the input material quantity is also possible.

Hope this can help.

regards,

kaushik

Former Member
0 Kudos

anybody know how to change the posting date when excute the CO27? i found system always default the current date, but for me i want to change the posting date before save.