Skip to Content
0
Former Member
Dec 02, 2009 at 10:13 AM

Credit Mangement problem with S066

328 Views

Hi Guys!

I have bussines scenario:

I created sales order with one item (ATP confirmed me quantity) but credit control show me message that my credit limit exceeded. When I saved credit control blocked sales orders (status B in VBUK- CMGST). In standard case credit control delete confirmation quantity in schedule linens and sales order value does not change value in S066 structure but in my case I change confirmation quantity u2013 now when I save document with credit management block system not change quantity in schedule lines (all lines are confirmed) and value form sales order increases value in structure S066-OEIKW.

My problem: From business point of view, blocked sales order (B in VBUK- CMGST) cannot change the value in S066 and quantities must remain confirm in schedule lines , but after release (in transaction VKM3, status D in VBUK- CMGST) value must be include in S066.

thanks

Kris