Material to Material Stock Transfer

47 Views

Dear Friends

We have a material X. X has a BOM & routing. X is actually molten aluminium and consumed while we manufacture casting parts.

X=A+(-)Dross( BOM)

We create a production order for X and confirm it from co11 by changing BOM. Thus once the production order gets confirmed X is generated through 101 , Dross is generated through 531 and some chips/ scrap( suppose V) is made to consumed thru 261.

Now we want to create a different part code for material X, lets say Z.

BOM of Z= V+(-) Dross. We will maintain a routing and production order for Z. Thus when we will confirm Z , Z will be generated through 101, V ( chips) will be consumed through 261 and dross will be generated through 531.

Now we need to do material to material stock transfer through 309. Can there be any other movement type through the stock of X can be directly transferred to Z? Can this be automatically done once we confirm the production order?

Thanks