Hi Exports,
We are using "ZD" document type to create PO with reference to PR which are created by MRP run.
I have few PRs which are created by the MRP controler.
My enduser is trying to create some PO with reference to the existing PR.
In my PR Line Item 1 - material X , Quantity is 240 & My user is trying to create PO based on the PR with 240 quantity only.
Source list is available for that material & vendor combination.
At the time of creating the PO system is throwing an error like " THE PO QUANTITY EXCEEDED TOLERANCE , MAXIMUM ORDER QUANTITY SHOULD BE LESS THEN EQUAL TO 0 ".
In my PO tolerance limit is 5%- Over tolerance limit & 0% - lower tolernce limit was maintained.
Please help me to solve this issue.
I am looking forward to hear you all.
Thanks in advance.
Regards
Dibya