Hi All,
We have the following scenario and would appreciate if you give your comments/answers to get it resolved.
We are using strategy 40 planning with final assembly and consumption mode backward/forward with FWD period 10 and Backward 20 days maintained in the MRP view and the planning horizon is maintained at plant level as 180 days.
Eg: requirement on 12/02/2009 is 100 qty as per the above settting system is checking first the backward 20 days and consuming the PIR and qty was 50 and remaining qty 50 it is cosumed from the future that after the requirement date i.e 10 days forward.
But there are Independent requirement of 80 qty on 11/02/2009 and 45 qty 11/05/2009 lying in the system which are not consumed. Now the question is how to get rid off this requirement from the system.
I tried with increasing the back ward period upto 35 days and ran MRP but still system is not picking this requirement.
I hope the above scenario is clear and very much appreicate if you give your quick solution to get rid of this requirement.
Regards,
Patil JB