cancel
Showing results for 
Search instead for 
Did you mean: 

Aggregate Demand accross multiple planning areas

Former Member
0 Kudos

I am currently using SAPbyDesign.

I have 4 internal planning areas representing 4 DCs each with their own demand plans released.

I do not have internal production capability, all POs are written for outside vendors.

How do I roll-up demand from all 4 planning areas to one MOQ/rounding values? Right now I can bundle Purchase Requests onto 1 PO but each Purchase Request has it's own, inaccurate, MOQ. The MOQs live at the separate planning areas so this logically will be the outcome but is not the desired outcome.

How can I use MRP to roll-up all 4 planning areas to the overall MOQ but break out each location's demand on the PO?

End goal: MRP produces POs (from PRs) that total a certain MOQ/rounding value but are broken out to each location based on allocation needs.

Do I need internal production setup? Do I need a separate RP run? Can this only by done in APO/PPDS?

Accepted Solutions (0)

Answers (0)