Skip to Content
0
Former Member
Dec 01, 2009 at 10:28 AM

rounding in CBP using HB lot size

29 Views

hi

we are using following data for a material:

MRP Type : VB

Lot size : HB

ROP= 2

Maximum stock level = 26

Current stock = 1

my requirement is as follows:

whenever i will run MRP , proposal should be generated in multiples of 10

e.g. if I run MD03 in above sitiuation, I want that proposal should be generated for only 20

tht means future stock = 1+20=21 (which is less than Max stock level = 26)

and order will be in multiples of 10.

pl suggest

BR

jeevan