hi
we are using following data for a material:
MRP Type : VB
Lot size : HB
ROP= 2
Maximum stock level = 26
Current stock = 1
my requirement is as follows:
whenever i will run MRP , proposal should be generated in multiples of 10
e.g. if I run MD03 in above sitiuation, I want that proposal should be generated for only 20
tht means future stock = 1+20=21 (which is less than Max stock level = 26)
and order will be in multiples of 10.
pl suggest
BR
jeevan