Sample Scenerio:

1. Initial Process Order qty: 10pc

2. Confirmed QTY.: 9 PCS.

3. Rejection qty .: 1 pc.

4. Now that one pc. is to be reworked in operation no.0020.

pls let me know how this shud be manage ,what are the necessary settings .

rgds

prerna

Accepted Solutions (1)

Accepted Solutions (1)

rupesh_brahmankar3
Active Contributor
0 Kudos

Dear,

Please refer my reply from these links,

/people/rupesh.brahmankar3/blog/2009/07/27/rework-in-manufacturing

Regards,

R.Brahmankar

Former Member
0 Kudos

Dear thanx for reply ....

what are the preriquisite ?

rgds

prerna

Former Member
0 Kudos

after prd ordr craeted at co07 , what about comaponent ? components are previously arrange or new PO will be created ?

this are some doughts , please explain in understandable way...

waiting for reply .

rgds

prerna

rupesh_brahmankar3
Active Contributor
0 Kudos

Dear,

If you required the components in rework operation then assign it to the system will create PR as per the stock availability.

If you don't need any components then don't assign it there. Say Granding is one operation where finishing is not as per quality standard then in that case we create the rework order through CO07 here we don't required any component during the rework operation processing .

Hope clear to you.

Regards,

R.Brahmankar

Ritz
Active Contributor
0 Kudos

Prerna,

in CO07 you need tos select referance operation set for adding operation which will be neeed for reqork

other wise you can manualy add operations in it.

about the component as every reqork will be different each time you need to add component manualy in teh production order.

also you need to check what type of settlemet you want for this orders.

some companies want a separate production order to process this rejected quantity and some clients want to use the same process order,

there are manys ways to process rework in SAP , so it will be better try to check what kind of reprocess your bussiness needs and then you can search for solution to map it in SAP.

regards

Ritesh

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi Prerna,

Please refer to the BPP and Config guide in the following link:

http://help.sap.com/bp_bl603/BBLibrary/HTML/151_EN_US.htm

Hope it helps.

Cheers,

Kaushik

Ritz
Active Contributor
0 Kudos

Hi ,

You can insert new operation in existing production order manually and complet the processing as well as confirmation for same.

another way is you can create a new production order , without a material and process the reqork through it.